NPG undertook the lowering of the Caloundra Rugby League Field. This project was required in order to increase the flood storage volume for the local community.
NPG undertook the challenging Stormwater replacement works and guard upgrade project located at Jones Road Buderim.
NPG provided the Design and Construction of the Milne Park, Mons Carpark for Sunshine Coast Council
The works were constructed with zero harm to the environment, property or personnel.
NPG was awarded the Construction of multiple sites – Chevallum and Tooway Bridges Scour Protection Works.
NPG Contracting was awarded the Design and Construction of the Riverside Park Pedestrian Bridge
NPG Contracting was awarded the Honey Farm Road Water Main Upgrade project by Sunshine Coast Council to provide approximately 1900m of newly installed 180mm water main to feed the future Honey Farm Road Sporting Development.
NPG Contracting was contracted by SunCentral Maroochydore to provide deliver civil works to complete the roadway and associated services to connect the SunCentral CBD Vacuum Disposal Facility to the existing road network.
Sunshine Coast Council awarded NPG Contracting to upgrade a 450m section of Camp Flat Road at Bli Bli as part of a staged upgrade of collection road.
NPG Civil was the Contractor engaged to deliver all the civil works for the Biodiesel Upgrade project.
NPG Civil was the Civil Contractor engaged to deliver all the civil works for the construction of the Miles Motel. The project was delivered in the small rural town of Miles at the height of the Coal Seam Gas developments in the Surat Basin.
NPG Civil was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.
NPG Civil was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:
The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.
Sunshine Coast Council awarded NPG Civil to upgrade a 717m section of Diamond Valley Road at Diamond Valley. The program of works included:
NPG Civil was awarded the construction of a 3 into 13 subdivision in Nerang. The program of works included
NPG Civil was contracted by the Sunshine Coast Council to provide civil construction and management of the extension to the existing Caloundra Sports Complex with the inclusion of 3 additional Netball Courts with a Basketball Court to create one multi-sport court.
NPG Civil was engaged to execute the survey, detailed excavation and concrete structures for Biodeisel upgrades to the fuel terminal.
NPG’s experienced team in civil construction started in the Power industry and continues to provide quality inspection services as client-side representative for civil inspections on substation and transmission line construction.
NPG Civil provided senior management to the EPC contractor including the on-site Construction Manager and also Completion Supervisor and QA/QC inspector services.
The $3 billion BMA hay Point Coal Port expansion required the development of a new quarry for the 12ha reclamation to extend the seawall and provide additional storm surge protection to the port facility.
As Principal Contractor, NPG Civil was commissioned to upgrade three strategic high voltage transmission lines with anti-tamper security nuts.
Located at Collinsville Queensland, NPG Civil was the builder for the construction and approvals for a 6 unit development in the central Queensland mining town of Collinsville.
NPG Civil was subcontracted to perform detailed excavation and form, reo and pour concrete for a Motel development in the Surat Basin in South West Queensland.
Providing Project Management and Supervision, the Pre-Assembled Units (PAU) set for LNG sites throughout the Surat Basin for Origin and the APLNG upstream project required mechanical and electrical rectification and preservation works to meet site acceptance.
Located at Collinsville Queensland, NPG Civil was the builder for the construction and approvals for a 6 unit development in the central Queensland mining town of Collinsville.
NPG Civil was subcontracted to perform detailed excavation and form, reo and pour concrete for a Motel development in the Surat Basin in South West Queensland.
NPG Civil was engaged to execute the survey, detailed excavation and concrete structures for Biodeisel upgrades to the fuel terminal.
As Principal Contractor, NPG Civil was commissioned to upgrade three strategic high voltage transmission lines with anti-tamper security nuts.
Providing Project Management and Supervision, the Pre-Assembled Units (PAU) set for LNG sites throughout the Surat Basin for Origin and the APLNG upstream project required mechanical and electrical rectification and preservation works to meet site acceptance.
NPG’s experienced team in civil construction started in the Power industry and continues to provide quality inspection services as client-side representative for civil inspections on substation and transmission line construction.
NPG Civil provided senior management to the EPC contractor including the on-site Construction Manager and also Completion Supervisor and QA/QC inspector services.
The $3 billion BMA hay Point Coal Port expansion required the development of a new quarry for the 12ha reclamation to extend the seawall and provide additional storm surge protection to the port facility.
Contact NPG Civil to discuss how we can help with your project