The project consisted of over 350m3 of foundations, floor slabs, suspended slabs, stairs, driveways and footpaths. The site conditions provided a challenge working amongst many trades in a restrictive site size amongst neighbouring residential property owners. NPG Contracting was able to negotiate the small site and work with other trades to maintain the tight schedule. All works occurred on site without incident, NPG Contracting instigated a combined site meeting to enable greater awareness to activities on site and improve site safety for all trades.
Client
FK Gardner and Sons
Location
Miles, Queensland
Services Supplied
NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.
NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:
The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.
Call NPG Contracting on 0421 621 378 to discuss how we can help with your project
or