New surge bins, jetty, third berth, trestle and out-loading conveyor where required to provide additional capacity to the existing Port 44MPa capability. NPG Contracting provided the on-site lead civil engineering management to the EPC for the on shore construction. Carrying out site civil engineering services to reclamation, concrete structures, temporary and permanent port facilities, roads and services, we were able to provide effective solutions to on-site engineering issues without causing delay to the construction schedule.
Client
Bechtel
Location
Hay Point, Queensland
Services Supplied
NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.
NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:
The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.
Call NPG Contracting on 0421 621 378 to discuss how we can help with your project
or