0421 621 378

Honey Farm Water Main Upgrade

NPG Contracting was awarded the Honey Farm Road Water Main Upgrade project by Sunshine Coast Council to provide approximately 1900m of newly installed 180mm water main to feed the future Honey Farm Road Sporting Development. The works included:

  • Erosion and Sediment Control
  • Traffic Control
  • Pipe Trenching and Backfill
  • Under boring and grouting
  • HDPE Pipe Welding
  • Pipe Testing and Disinfection
  • Landscaping and reinstate of concrete pathways

Included in the scope of works was the under boring of the TMR controlled Caloundra Road, requiring a section of line approximately170m in length of 350mm pipe for encapsulating the 180mm watermain from the southern to northern sides of the busy Caloundra Road.

Key Information

Client
Sunshine Coast Council

Duration
December 2020–May 2021

Back To Projects

OTHER PROJECTS

Caloundra Rugby League Lowering

NPG undertook the lowering of the Caloundra Rugby League Field. This project was required in order to increase the flood storage volume for the local community.

View Project

Storm Water & Guardrail Upgrade

NPG undertook the challenging Stormwater replacement works and guard upgrade project located at Jones Road Buderim.

View Project

Design & Construct Carpark Mons

NPG provided the Design and Construction of the Milne Park, Mons Carpark for Sunshine Coast Council

View Project

Contact NPG Civil to discuss how we can help with your project

SEND US AN EMAIL

Proud Members Of: