NPG has been engaged across multiple sites across Queensland to support Powerlink’s civil inspection requirements on substations/transmission lines connecting the renewable projects for solar and wind farms. Our civil inspectors work on a daily basis with the principal contractor to ensure specification requirements are maintained and minimise schedule delays through facilitating Client directions where required. With our RPEQ qualification, we provide Powerlink flexibility in sign-off for the works we inspect and our understanding of the design requirements and specifications allow us to maintain clarity of requirements on site to the Principal Contractor.
Client
Powerlink Queensland
Location
Walkamin | Strathmore | Haughton
Services Supplied
NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.
NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:
The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.
Call NPG Contracting on 0421 621 378 to discuss how we can help with your project
or