NPG Contracting was awarded the construction of a 3 into 13 subdivision in Nerang. The program of works included:

  • Clearing and Grubbing in an environmentally sensitive area
  • Widening of Country Crescent
  • Internal road construction
  • Installation of new kerb and channel
  • Stormwater and Water reticulation installation
  • Bitumen and asphalt sealing
  • Road furniture
  • Landscaping
  • Bio-Basin Swale

The project was delivered to a high-quality finish in line with the developer’s brief. With adverse weather, circa 1800mm rainfall across the project duration, and a COVID pandemic, NPG was able to deliver the project in line with the project drawings and approvals.

Key Information

Client
VeeSuant

Duration
January 2020 – September 2020

Services Supplied

  • Building Design and Construction
Back To Projects

OTHER PROJECTS

Winston Road Widening

NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.

View Project

Huonbrook Estate Stage 17A

NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:

View Project

Concrete Barriers – Eton Range Realignment Project

The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.

View Project

Call NPG Contracting on 0421 621 378 to discuss how we can help with your project

or

SEND US AN EMAIL

Proud Members Of: