0421 621 378

APLNG Rectification and Preservation

Providing Project Management and Supervision, the Pre-Assembled Units (PAU) set for LNG sites throughout the Surat Basin for Origin and the APLNG upstream project required mechanical and electrical rectification and preservation works to meet site acceptance.

NPG Contracting was brought on board to manage the site works including Supervision, cost control, scheduling, quality control and Client Relations. Managing changing scope, shifting PAU departure dates to site, the project called for a flexible work group to deliver mechanical and electrical scopes of work in tight time frames with detailed documentation for quality control reference when completed and delivered to site. We were successful in completing all skids prior to the completion date and had zero delays to departure date, all this while maintaining a safety record of zero LTI’s over the life of the project.

Key Information

Client
UGL Resources

Location
Port of Brisbane, Queensland

Services Supplied

  • Project Management & Supervision
  • Cost control
  • Scheduling
  • Quality Control
Back To Projects

OTHER PROJECTS

Winston Road Widening

NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.

View Project

Huonbrook Estate Stage 17A

NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:

View Project

Concrete Barriers – Eton Range Realignment Project

The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.

View Project

Call NPG Contracting on 0421 621 378 to discuss how we can help with your project

or

SEND US AN EMAIL

Proud Members Of: