The project was performed in an operational fuel terminal which required tight adherence to the permit to work system. The use of non-mechanical excavation on all foundations revealed unidentified services which NPG worked with our client to deliver the necessary changes in location or design to maintain schedule for the civil construction scope. All supports and skids were completed in line with the project schedule and budget.
Client
ATOM (ULG/BP)
Location
Brisbane, Queensland
Services Supplied
NPG Contracting was engaged to execute the survey, detailed excavation and concrete structures for Biodeisel upgrades to the fuel terminal.
The Level 8 Commerical office required an update in its layout to provide the owner an increase in flexibility in available lease space for potential tenants.
NPG’s experienced team in civil construction started in the Power industry and continues to provide quality inspection services as client-side representative for civil inspections on substation and transmission line construction.
Call NPG Contracting on 0421 621 378 to discuss how we can help with your project
or