NPG Contracting provided the design and construction of the office to allow the ease in delivery for the Client. Through various revisions in the layout, and supporting the options to maximise the leasing return through partnering with a leasing agent, NPG were able to complete a newly designed layout that meet not only the owners requirements but also securing a new lease and making modifications to ensure the lease had all the faciltities required for the long term lease. Incorporating glass partitions to increase natural light through the offices, HVAC modifications and fire system improvements, NPG completed the office fitout ahead of schedule allowing the owner to reduce the time the property was unavailable for lease.
Client
KK Enterprise
Location
Southport, Queensland
Services Supplied
NPG Contracting was contracted by Sunshine Coast Council to upgrade Winston Road South at Palmwoods from the existing gravel road to a 4-metre-wide bitumen seal road with localised widening to 6m along an 850m section.
NPG Contracting was the Principal Contractor engaged to deliver the land development of Huonbrook Estate in Terranora, Stage 17A civil construction including:
The supply of all labour, equipment and vehicles to prepare, deliver and document the installation of permanent scope for the rock pitching, gabion mattress and concrete safety barriers provide on the Eton Range Realignment Project.
Call NPG Contracting on 0421 621 378 to discuss how we can help with your project
or